New generation MRVC - MUTP MUTP Coaches Phase I & II

Project: A

Period: 2007 – 2009

Manufacture, Supply & Installation of FRP panelling for MRVC coaches

  • Phase – I 500 coaches (Completed)

Project: B

Period: 2015 – 2016

Manufacture, Supply & Installation of PHENOLIC RESIN BASE FRP panelling for MRVC coaches

  • Phase – II 288 coaches (In process)

MRVC – PH – II Concept

Phenolic Resin base FRP Panelling consist of:

  • Sidewall
  • Doorway
  • End Wall Ceiling
  • Air Duct

MRVC - MUTP Coaches